Dell UPS 10000R Uživatelský manuál Strana 46

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 92
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 45
46
|
Operation
Measurements
The measurements screens provide useful measurement information on:
S Output watts, VA, current, power factor, voltage, and frequency
S Input voltage and frequency
S Battery voltage, percentage charged, and time remaining
S Instantaneous Headroom Watts remaining
S Peak Headroom Watts (the remaining watts available to support the load at peak demand,
includes the date and timestamp of the peak demand)
S Peak Consumption Watts (the peak power demand on the UPS, includes the date and timestamp
of the peak demand)
S Present kWh Consumption (the kWh demand on the UPS averaged over the past hour)
S Cumulative kWh Consumption (the total kWh usage, includes the date and timestamp since it
was last reset)
S DC bus voltages (measured internal bus voltages for double conversion)
NOTE:
For Peak Consumption Watts and Cumulative kWh Consumption, input level is not supported.
Zobrazit stránku 45
1 2 ... 41 42 43 44 45 46 47 48 49 50 51 ... 91 92

Komentáře k této Příručce

Žádné komentáře